chore: auto-commit before merge (loop primary)

This commit is contained in:
2026-02-16 14:36:25 +00:00
parent 9276955fa8
commit aca57714e4
23 changed files with 1859 additions and 513 deletions
+13
View File
@@ -0,0 +1,13 @@
{"ts":"2026-02-16T13:57:22.843138073+00:00","iteration":0,"hat":"loop","topic":"work.start","triggered":"planner","payload":"# Task: CareerConstellation Overhaul\n\nRefactor, visually improve, and add chronological animation to the CareerConstellation D3 force chart — the centrepiece of the portfolio's Patient Pathway section.\n\n## Requirements\n\n### Phase 1 — Refactor the Monolith\n\nDecompose `src/components/CareerConstellation.tsx` (1102 lines) into focused modules:\n\n```\nsrc/components/constellation/\n CareerConstellation.tsx -- Orchestrator (< 300 lines)\n MobileAccordion.tsx -- Mobile tap-to-e... [truncated, 8244 chars total]"}
{"payload":"Phase 1: Refactor monolith into 9 files (constants, types, 3 hooks, 3 components, orchestrator). Detailed signatures and build order in .ralph/plan.md","topic":"plan.ready","ts":"2026-02-16T14:00:52.562250965+00:00"}
{"payload":"Phase 1 complete: monolith decomposed into 9 files. Orchestrator 288 lines. lint/typecheck/build pass. Commit 65b2657.","topic":"build.done","ts":"2026-02-16T14:07:01.499647791+00:00"}
{"payload":"Phase 2 Visual Improvements: 5 tasks created for link styling, skill nodes, role nodes, entry animation, and legend counts. Planner should analyse the decomposed codebase (src/components/constellation/ and src/hooks/) and produce detailed implementation plan.","topic":"work.start","ts":"2026-02-16T14:08:10.797746949+00:00"}
{"payload":"Phase 2 Visual Improvements plan written to .ralph/plan.md. 5 tasks: link styling (strength-weighted, domain-colored, bezier), skill nodes (stroke, size encoding, glow), role nodes (gradient fill, highlight), entry animation (stagger sequence), legend counts. Build order: constants first, then links, skills, roles, legend, animation.","topic":"plan.ready","ts":"2026-02-16T14:12:03.119959409+00:00"}
{"payload":"Phase 2 complete: 5 tasks (links, skills, roles, entry animation, legend). lint 0 errors, typecheck clean, build success. Commit 7d7628c. Orchestrator 294 lines.","topic":"build.done","ts":"2026-02-16T14:17:06.835122520+00:00"}
{"payload":"Phase 3+4: Over-Time Animation + Interaction Integration. lint: pass, typecheck: pass, build: pass. 5 tasks created. Planner should analyze current codebase (especially useForceSimulation.ts entry animation, timeline.ts education entities, useConstellationHighlight.ts) and produce detailed implementation plan for chronological animation with multiplicative opacity model.","topic":"work.start","ts":"2026-02-16T14:18:24.491507486+00:00"}
{"payload":"Phase 3+4 plan written to .ralph/plan.md. 5 tasks: data (education entities), hook (useTimelineAnimation with rAF scheduler + state machine), visual (remove entry animation, add reveal effects + year indicator), integration (multiplicative opacity + interaction wiring), a11y (reduced-motion + play/pause button). Build order: data → hook → visual → integration → a11y.","topic":"plan.ready","ts":"2026-02-16T14:21:47.204426315+00:00"}
{"payload":"Phase 3+4 complete: education entities, useTimelineAnimation hook, chronological reveal, multiplicative opacity, interaction wiring, play/pause button, reduced-motion support. lint: 0 errors, typecheck: clean, build: 4.51s. Commit 8b674ff.","topic":"build.done","ts":"2026-02-16T14:32:07.328158738+00:00"}
{"payload":"334 is fine","topic":"human.guidance","ts":"2026-02-16T14:34:30.279287876+00:00"}
{"payload":"All quality gates pass. Orchestrator at 285 lines. All success criteria met.","topic":"build.done","ts":"2026-02-16T14:35:20.154349304+00:00"}
{"payload":"All phases complete. lint: 0 errors, typecheck: clean, build: pass (4.57s). Orchestrator 285 lines. All tasks closed.","topic":"LOOP_COMPLETE","ts":"2026-02-16T14:36:18.771050831+00:00"}
{"ts":"2026-02-16T14:36:25.800795816+00:00","iteration":10,"hat":"loop","topic":"loop.terminate","payload":"## Reason\ncompleted\n\n## Status\nAll tasks completed successfully.\n\n## Summary\n- Iterations: 10\n- Duration: 39m 2s\n- Exit code: 0"}