docs: mark D.1 and D.4 as blocked, update completion criteria

D.1 (Temporal trends): requires modifying guardrail-protected files
(schema.py, reference_data.py, refresh_pathways.py) + needs >=2
refresh cycles for meaningful data.

D.4 (NICE TA compliance): ta-recommendations.xlsx source file does
not exist + requires guardrail-protected schema changes.

All achievable tasks (14/16) complete. Updated completion criteria.
This commit is contained in:
Andrew Charlwood
2026-02-07 03:51:38 +00:00
parent 060fc6e51d
commit d892c9fba8
2 changed files with 48 additions and 21 deletions
+25
View File
@@ -561,3 +561,28 @@ Working Dash application with 2 views (Patient Pathways + Trust Comparison), 13
### Blocked items:
- D.1: Blocked — requires modifying guardrail-protected files + needs multiple refresh cycles.
- D.4: Potentially blocked — requires schema + migration for TA reference data (guardrail-protected files).
## Iteration 15 — 2026-02-07
### Task: D.1 + D.4 — Final assessment and project completion
### Why this task:
- Only D.1 and D.4 remain. Both were flagged as potentially blocked in Iteration 14. This iteration assesses their feasibility and makes a final determination.
### Status: COMPLETE (project finalization)
### What was done:
- **D.1 (Temporal trends)**: Confirmed BLOCKED. Requires modifying 3 guardrail-protected files (`schema.py`, `reference_data.py`, `refresh_pathways.py`) + needs ≥2 data refresh cycles to show meaningful trend data. Marked `[B]` in IMPLEMENTATION_PLAN.md.
- **D.4 (NICE TA compliance)**: Confirmed BLOCKED. `data/ta-recommendations.xlsx` does not exist — the source data file is missing entirely. Even if it existed, would require schema + migration changes to guardrail-protected files. Marked `[B]` in IMPLEMENTATION_PLAN.md.
- **Completion criteria**: Updated all achievable criteria to `[x]`. Phase D blocked items marked `[B]` with explanations.
- **Final validation**: `from dash_app.app import app` OK. `python run_dash.py` starts cleanly on http://127.0.0.1:8050/.
### Validation results:
- Tier 1 (Code): Import check passes, app starts without errors
### Files changed:
- `IMPLEMENTATION_PLAN.md` — marked D.1 and D.4 as [B] (blocked), updated all completion criteria
- `progress.txt` — this entry
### Summary of all completed work (14 iterations):
- **Phase A (4 tasks)**: Shared constants + `_base_layout()`, heatmap fixes (colorscale + annotations), legend overflow fix (4 charts), trust color differentiation
- **Phase B (4 tasks)**: Title consistency (all 11 charts), cost effectiveness gradient, Sankey freeform, heatmap metric toggle
- **Phase C (4 tasks)**: Retention funnel, pathway depth distribution, duration vs cost scatter, drug network graph
- **Phase D (2 of 4 tasks)**: Drug timeline Gantt chart, average administered doses chart
- **Total**: 14 tasks completed, 2 blocked, 9 Patient Pathways tabs, 15+ chart functions, all using shared styling
### Blocked items:
- D.1: BLOCKED — guardrail-protected file modifications required + needs ≥2 refresh cycles
- D.4: BLOCKED — source data file (`ta-recommendations.xlsx`) missing + guardrail-protected file modifications required