From a22b2e7811b2de35ec7d85927ed67583a7305b32 Mon Sep 17 00:00:00 2001 From: Andrew Charlwood Date: Sat, 7 Feb 2026 02:57:59 +0000 Subject: [PATCH] docs: update progress.txt with iteration 6 (Task B.2 complete) --- progress.txt | 31 +++++++++++++++++++++++++++++++ 1 file changed, 31 insertions(+) diff --git a/progress.txt b/progress.txt index 7b8b253..857af96 100644 --- a/progress.txt +++ b/progress.txt @@ -226,3 +226,34 @@ Working Dash application with 2 views (Patient Pathways + Trust Comparison), 13 - Both are quick changes — could potentially do B.2+B.3 together if scoped carefully, but the loop rules say one task per iteration. ### Blocked items: - None + +## Iteration 6 — 2026-02-07 +### Task: B.2 — Cost effectiveness smooth gradient +### Why this task: +- B.2 is the next Phase B task after B.1. Iteration 5 explicitly recommended B.2 or B.3. B.2 addresses the crude 3-bin color threshold in the cost effectiveness lollipop chart. +### Status: COMPLETE +### What was done: +- **`create_cost_effectiveness_figure()`**: Replaced 3-bin hard threshold color assignment (green if ratio<0.33, amber if <0.66, red otherwise) with a smooth `_lerp_color()` inner function that does linear RGB interpolation: + - Ratio 0–0.5: Green (#009639) → Amber (#ED8B00) + - Ratio 0.5–1.0: Amber (#ED8B00) → Red (#DA291C) + - Includes clamping to [0,1] for safety +- Net change: +9 lines (replaced 8-line loop with 17-line function + 1-line list comprehension) +- `_base_layout()` was already applied in B.1 — no further layout changes needed +### Validation results: +- Tier 1 (Code): `from dash_app.app import app` OK. `python run_dash.py` starts cleanly, HTTP 200. +- Tier 2 (Visual): Functional test confirmed 5 gradient points: 1000→rgb(0,150,57) green, 3000→rgb(118,144,28) yellow-green, 5000→rgb(237,139,0) amber, 7000→rgb(227,90,14) orange-red, 9000→rgb(218,41,28) red. Smooth interpolation verified. +### Files changed: +- `src/visualization/plotly_generator.py` — replaced 3-bin color logic with `_lerp_color()` smooth gradient +- `IMPLEMENTATION_PLAN.md` — marked B.2 subtasks [x] +### Committed: cbac37e "fix: smooth green→amber→red gradient for cost effectiveness chart (Task B.2)" +### Patterns discovered: +- Inner function `_lerp_color()` defined inside `create_cost_effectiveness_figure()` keeps it scoped to where it's used. If other charts need similar gradients, could promote to module level. +- The data is reversed before coloring (line 486), so colors are assigned based on position in the reversed list. But since `_lerp_color` uses the actual cost value via `(c - min_cost) / cost_range`, the reversal doesn't affect color correctness. +### Next iteration should: +- Do Task B.3: Sankey narrow-screen fix. Very small change: + 1. Search for `def create_sankey_figure` to find the function + 2. Change `arrangement="snap"` → `arrangement="freeform"` + 3. Increase `pad` from 20 → 25 +- After B.3, Task B.4 (heatmap metric toggle) is the last Phase B task — it's more involved (adding SegmentedControl components + callback wiring). +### Blocked items: +- None